RBB 700 OB

Support, Patrol or Crew
LOA 7.10 m
Propulsion Outboard
Layout Open or centre console
Layout
LH
LOA
BOA
Draft
Weight
Open or centre console
6.50 m
7.10 m
2.35 m
0.30 m
1500 kg
Payload
Engine
Power
Fuel
700 kg
1 or 2
max 200 (350kg) hp
Gasoline or diesel
Tank
Propulsion
Speed
Range
2x 25 or 90 fixed liter
Outboard
35 knots
50 nm
Seats (opt)
Drawings
Drawings
Drawings

RBB 900 SD

Crew tender, Patrol, Survey
LOA 8.70 m
Propulsion Outboard
Layout Centre console
Layout
LH
LOA
BOA
Draft
Weight
Centre console
8.00 m
8.70 m
2.50 m
0.30 m
2200 kg
Payload
Engine
Power
Fuel
900 kg
1 or 2
max 300 (400 kg) hp
Gasoline or Diesel
Tank
Propulsion
Speed
Range
450 liter
Outboard
40 knots
150 nm
Seats (opt)
Drawings
Drawings
Drawings

LS 650 EO

Pilot boat
LOA 11.95 m
Propulsion Water jet
Layout Cabin
Layout
LH
LOA
BOA
Draft
Weight
Cabin
11.00 m
11.95 m
3.40 m
0.50 m
7000 kg
Payload
Engine
Power
Fuel
2000 kg
2
max 1000 (1500kg) hp
Diesel
Tank
Propulsion
Speed
Range
2x 800 liter
Water jet
35 knots
400 nm
Seats (opt)
Drawings
12
Not available

Standard hull setup

PE buoyancy balls below deck

TPU fenders all around

Anti-slip deck

Cleats, handrails on gunwale

4 Lifting eyes with slings

Seats

Fender jockey seats with grab handle, storage and air cushion

Shark Ultra suspension jockey seats for open boats

Cleemann Nautic Star adjustable suspension seats for cabin boats

Rental

BIMCO bareboat charter for all our stock and demo boats.

Please ask for our availability and pricing

Options

  • Folding A-Frame or T-top with windshield
  • Towing bollard
  • Bimini
  • Self righting system
  • Single lifting

Equipment

  • GPS / plotter / echo
  • VHF / AIS
  • Radar
  • Night Vision
  • Heating
  • Airconditioning

Accessories

  • Road or storage trailer
  • Fixed or floating boat lift
  • Davit system
  • PE Floating Dock
  • Transport and storage cradle
  • 40’HC double doors container for transport, service and storage

Warranty

5 years on hull

1 year manufactories warranty on installed components

Delivery time

8-12 weeks

Classification

CE-C Coastal waters according RCD

Hull certificate DNV-GL optional

BV design approval optional

Payment terms

50% deposit at order, 50% before delivery